Safety is a commitment,not a statistic
Our site-specific safety plan, experienced field supervision and disciplined crews put safety first on every job, every day. That commitment protects our people, your schedule and the people who use the buildings we build.
Every worker goes home the same way they arrived, on every shift, with zero compromise.
Three-year safety performance
EMR, TRIR and DART are the construction industry's standard measures of safety performance. Lower is better: an EMR below 1.00 means a safer-than-average record.
Five checkpoints between the shop and closeout
Nothing advances on our projects until the phase behind it is verified. Each checkpoint below is documented, signed off and shared with the project team.
Preinstallation Meeting
GC, Architect and Manufacturer align on details, sequence and testing before work starts.
Shop / Fabrication QC
Every unitized frame inspected against approved shop drawings and production release standards before it ships.
First-Install Inspection
First installed bay reviewed with the Project Team to set the standard for the rest of the project.
Field Water Testing
AAMA 501.2 and ASTM E1105 testing on installed work at set intervals, documented and shared with the project team.
Punch & Closeout
Punch items closed promptly, with warranties, O&M manuals and as-builts turned over at completion.
Coverage that outlasts the punch list
Quality is owned, not assumed
Quality is owned by the installation crew and verified by management. CGC's written QC program assigns a dedicated QC lead to the project. They document every inspection, test and deficiency from fabrication through closeout.
Weekly QC reports go to the Project Team, and nonconforming work is corrected before the next phase proceeds.