Safety & Quality

Safety is a commitment,not a statistic

Our site-specific safety plan, experienced field supervision and disciplined crews put safety first on every job, every day. That commitment protects our people, your schedule and the people who use the buildings we build.

Our Commitment

Every worker goes home the same way they arrived, on every shift, with zero compromise.

0.60
Current EMR
Down from 0.78 in 2024
0.00
TRIR (3-yr avg)
Total recordable incident rate
0.00
DART (3-yr avg)
Days away, restricted or transferred
445,350
Hours without a lost-time incident
Consecutive hours worked
12
OSHA 30 trained foremen
Field leadership certified
21
Years with a full-time safety director
Dedicated, not collateral duty

Three-year safety performance

Metric202420252026
EMR0.780.620.60
TRIR0.000.00n/a
DART0.000.00n/a

EMR, TRIR and DART are the construction industry's standard measures of safety performance. Lower is better: an EMR below 1.00 means a safer-than-average record.

Quality Control & Testing

Five checkpoints between the shop and closeout

Nothing advances on our projects until the phase behind it is verified. Each checkpoint below is documented, signed off and shared with the project team.

01

Preinstallation Meeting

GC, Architect and Manufacturer align on details, sequence and testing before work starts.

02

Shop / Fabrication QC

Every unitized frame inspected against approved shop drawings and production release standards before it ships.

03

First-Install Inspection

First installed bay reviewed with the Project Team to set the standard for the rest of the project.

04

Field Water Testing

AAMA 501.2 and ASTM E1105 testing on installed work at set intervals, documented and shared with the project team.

05

Punch & Closeout

Punch items closed promptly, with warranties, O&M manuals and as-builts turned over at completion.

Warranty

Coverage that outlasts the punch list

Manufacturer (finish / system)20 years
Insulating glass units10 years
Installation / workmanship2 years
QC Program

Quality is owned, not assumed

Quality is owned by the installation crew and verified by management. CGC's written QC program assigns a dedicated QC lead to the project. They document every inspection, test and deficiency from fabrication through closeout.

Weekly QC reports go to the Project Team, and nonconforming work is corrected before the next phase proceeds.

Dedicated QC lead assigned to every project
Every inspection, test and deficiency documented
Weekly QC reports issued to the Project Team
Nonconforming work corrected before the next phase